本页由英文机器翻译而成,可能存在错误。

规划 › 种植时间 › Kohlrabi
种植时间

什么时候种 Kohlrabi

没有哪一个日期放之四海而皆准。Kohlrabi 的种植时间是相对你自己的终霜来定的,所以答案 从 December 9 (San Diego, CA) 一直排到 May 14 (Burns, OR)。 在下面找你所在的城镇。

简短版

怎么下地either
室内育苗 终霜前 6 周
露地定植 终霜前 28 天到终霜后 7 天
收获天数45–60
耐寒程度hardy
最低土壤温度40 °F
传统月相娥眉月
值得一提:CSU groups kohlrabi with the hardy crops (2-4 weeks before last frost). Fast enough at 45-60 days to work in both seasons. Harvest at 2-2.5 inches - larger bulbs go woody.

在你所在的城镇,什么时候种 kohlrabi

这里的每个日期都是按当地自己的霜冻日期算出来的——有气象站的地方用 NOAA 实测站点常态值, 没有的地方则由周边气候网格推算。“最佳月相日”是时间窗内落在该作物传统月相上的那几天。

地点分区 室内育苗 露地定植 秋季播种 最佳月相日
Birmingham, AL 8a Feb 7 Feb 21 – Mar 28 Aug 13 – Aug 30 Feb 21–23, Mar 19–21
Greensboro, AL 8b Feb 3 Feb 17 – Mar 24 Aug 13 – Aug 30 Feb 18–23
Hoover, AL 估算 8b Feb 6 Feb 20 – Mar 27 Aug 12 – Aug 29 Feb 20–23, Mar 19–20
Huntsville, AL 估算 8a Feb 15 Mar 1 – Apr 5 Aug 6 – Aug 23 Mar 19–24
Mobile, AL 9a Jan 10 Jan 24 – Feb 28 Sep 7 – Sep 24 Jan 24, Feb 18–22
Montgomery, AL 估算 8b Jan 30 Feb 13 – Mar 20 Aug 17 – Sep 3 Feb 18–23
Tuscaloosa, AL 估算 8a Feb 6 Feb 20 – Mar 27 Aug 12 – Aug 29 Feb 20–23, Mar 19–20
Anchorage, AK 5b Mar 24 Apr 7 – May 12 Jul 3 – Jul 20 Apr 18–22
Badger, AK 估算 2a Apr 1 Apr 15 – May 20 Jun 11 – Jun 28 Apr 18–22, May 17
Bethel, AK 4a Apr 9 Apr 23 – May 28 Jun 24 – Jul 11 May 17–22
Eagle River, AK 估算 5a Mar 30 Apr 13 – May 18 Jun 26 – Jul 13 Apr 18–22, May 17
Fairbanks, AK 2a Apr 1 Apr 15 – May 20 Jun 15 – Jul 2 Apr 18–22, May 17
Juneau, AK 7a Mar 23 Apr 6 – May 11 Jul 5 – Jul 22 Apr 18–22
Ketchikan, AK 8a Mar 11 Mar 25 – Apr 29 Jul 25 – Aug 11 Apr 18–22
Kodiak, AK 7b Mar 24 Apr 7 – May 12 Jul 5 – Jul 22 Apr 18–22
Nome, AK 4a Apr 24 May 8 – Jun 12 — May 17–22
Flagstaff, AZ 6a Apr 23 May 7 – Jun 11 Jun 30 – Jul 17 May 17–22
Phoenix, AZ 10a Nov 27 Dec 11 – Jan 15 Sep 26 – Oct 13 Dec 20–25
Tucson, AZ 9b Dec 25 Jan 8 – Feb 12 Sep 10 – Sep 27 Jan 19–24
Fayetteville, AR 估算 7a Feb 25 Mar 11 – Apr 15 Jul 31 – Aug 17 Mar 19–24
Fort Smith, AR 估算 8a Feb 17 Mar 3 – Apr 7 Aug 5 – Aug 22 Mar 19–24
Little Rock, AR 8a Feb 7 Feb 21 – Mar 28 Aug 12 – Aug 29 Feb 21–23, Mar 19–21
Antioch, CA 估算 9b Dec 22 Jan 5 – Feb 9 Sep 7 – Sep 24 Jan 19–24
Arden-Arcade, CA 估算 9b Jan 11 Jan 25 – Mar 1 Sep 2 – Sep 19 Feb 18–23
Bakersfield, CA 9b Dec 20 Jan 3 – Feb 7 Sep 9 – Sep 26 Jan 19–24
Chico, CA 估算 9b Jan 18 Feb 1 – Mar 8 Aug 30 – Sep 16 Feb 18–23
Chino, CA 估算 9a Jan 21 Feb 4 – Mar 11 Aug 30 – Sep 16 Feb 18–23
Citrus Heights, CA 估算 9b Jan 11 Jan 25 – Mar 1 Sep 2 – Sep 19 Feb 18–23
Clovis, CA 估算 9b Jan 2 Jan 16 – Feb 20 Sep 5 – Sep 22 Jan 19–24
Elk Grove, CA 估算 9b Dec 27 Jan 10 – Feb 14 Sep 7 – Sep 24 Jan 19–24
Eureka, CA 9b Jan 25 Feb 8 – Mar 15 Sep 1 – Sep 18 Feb 18–23
Fontana, CA 估算 9a Jan 25 Feb 8 – Mar 15 Aug 27 – Sep 13 Feb 18–23
Fresno, CA 9b Dec 3 Dec 17 – Jan 21 Sep 15 – Oct 2 Dec 20–25
Hesperia, CA 估算 9a Jan 25 Feb 8 – Mar 15 Aug 27 – Sep 13 Feb 18–23
Lancaster, CA 估算 8b Feb 12 Feb 26 – Apr 2 Aug 19 – Sep 5 Mar 19–24
Modesto, CA 估算 9b Jan 4 Jan 18 – Feb 22 Sep 4 – Sep 21 Jan 19–24
Oceanside, CA 9b Jan 5 Jan 19 – Feb 23 Sep 9 – Sep 26 Jan 19–24
Ontario, CA 估算 9a Jan 21 Feb 4 – Mar 11 Aug 30 – Sep 16 Feb 18–23
Palmdale, CA 估算 8b Feb 12 Feb 26 – Apr 2 Aug 19 – Sep 5 Mar 19–24
Pomona, CA 估算 9a Jan 21 Feb 4 – Mar 11 Aug 30 – Sep 16 Feb 18–23
Rancho Cucamonga, CA 估算 9a Jan 21 Feb 4 – Mar 11 Aug 30 – Sep 16 Feb 18–23
Redding, CA 9a Jan 20 Feb 3 – Mar 10 Aug 23 – Sep 9 Feb 18–23
Rialto, CA 估算 9a Jan 25 Feb 8 – Mar 15 Aug 27 – Sep 13 Feb 18–23
Roseville, CA 估算 9b Jan 11 Jan 25 – Mar 1 Sep 2 – Sep 19 Feb 18–23
Sacramento, CA 9b Dec 22 Jan 5 – Feb 9 Sep 3 – Sep 20 Jan 19–24
Salinas, CA 估算 9b Dec 19 Jan 2 – Feb 6 Sep 13 – Sep 30 Jan 19–24
San Bernardino, CA 估算 9a Jan 25 Feb 8 – Mar 15 Aug 27 – Sep 13 Feb 18–23
San Diego, CA 10b Nov 25 Dec 9 – Jan 13 Oct 2 – Oct 19 Dec 20–25
San Jose, CA 估算 9b Dec 29 Jan 12 – Feb 16 Sep 12 – Sep 29 Jan 19–24
Santa Clara, CA 估算 9b Dec 29 Jan 12 – Feb 16 Sep 12 – Sep 29 Jan 19–24
Santa Maria, CA 9b Dec 24 Jan 7 – Feb 11 Sep 14 – Oct 1 Jan 19–24
Stockton, CA 估算 9b Dec 31 Jan 14 – Feb 18 Sep 4 – Sep 21 Jan 19–24
Tracy, CA 估算 9b Dec 31 Jan 14 – Feb 18 Sep 4 – Sep 21 Jan 19–24
Vacaville, CA 估算 9b Dec 22 Jan 5 – Feb 9 Sep 7 – Sep 24 Jan 19–24
Victorville, CA 估算 8b Feb 2 Feb 16 – Mar 23 Aug 19 – Sep 5 Feb 18–23
Visalia, CA 估算 9b Jan 3 Jan 17 – Feb 21 Sep 4 – Sep 21 Jan 19–24
West Covina, CA 估算 9a Jan 21 Feb 4 – Mar 11 Aug 30 – Sep 16 Feb 18–23
Arvada, CO 估算 5b Mar 30 Apr 13 – May 18 Jul 5 – Jul 22 Apr 18–22, May 17
Aurora, CO 估算 6a Mar 24 Apr 7 – May 12 Jul 10 – Jul 27 Apr 18–22
Boulder, CO 估算 5b Apr 8 Apr 22 – May 27 Jun 28 – Jul 15 Apr 22, May 17–21
Centennial, CO 估算 6a Mar 24 Apr 7 – May 12 Jul 10 – Jul 27 Apr 18–22
Colorado Springs, CO 估算 6a Apr 1 Apr 15 – May 20 Jul 5 – Jul 22 Apr 18–22, May 17
Denver, CO 6a Mar 24 Apr 7 – May 12 Jul 11 – Jul 28 Apr 18–22
Fort Collins, CO 估算 5b Apr 5 Apr 19 – May 24 Jun 30 – Jul 17 Apr 19–22, May 17–18
Grand Junction, CO 7a Mar 12 Mar 26 – Apr 30 Jul 22 – Aug 8 Apr 18–22
Greeley, CO 估算 5b Mar 26 Apr 9 – May 14 Jul 6 – Jul 23 Apr 18–22
Highlands Ranch, CO 估算 6a Mar 24 Apr 7 – May 12 Jul 10 – Jul 27 Apr 18–22
Lakewood, CO 估算 5b Mar 30 Apr 13 – May 18 Jul 5 – Jul 22 Apr 18–22, May 17
Longmont, CO 估算 5b Apr 8 Apr 22 – May 27 Jun 28 – Jul 15 Apr 22, May 17–21
Pueblo, CO 5b Mar 19 Apr 2 – May 7 Jul 11 – Jul 28 Apr 18–22
Thornton, CO 估算 6a Mar 24 Apr 7 – May 12 Jul 10 – Jul 27 Apr 18–22
Westminster, CO 估算 5b Mar 30 Apr 13 – May 18 Jul 5 – Jul 22 Apr 18–22, May 17
Bridgeport, CT 估算 7a Mar 9 Mar 23 – Apr 27 Jul 26 – Aug 12 Mar 23–24, Apr 18–21
Danbury, CT 估算 7a Mar 9 Mar 23 – Apr 27 Jul 26 – Aug 12 Mar 23–24, Apr 18–21
East Norwalk, CT 估算 7a Mar 9 Mar 23 – Apr 27 Jul 26 – Aug 12 Mar 23–24, Apr 18–21
Hartford, CT 6b Mar 10 Mar 24 – Apr 28 Jul 18 – Aug 4 Mar 24, Apr 18–22
New Haven, CT 估算 7a Mar 4 Mar 18 – Apr 22 Aug 2 – Aug 19 Mar 19–24
North Stamford, CT 估算 7a Mar 10 Mar 24 – Apr 28 Jul 25 – Aug 11 Mar 24, Apr 18–22
Norwalk, CT 估算 7a Mar 9 Mar 23 – Apr 27 Jul 26 – Aug 12 Mar 23–24, Apr 18–21
Stamford, CT 估算 7a Mar 10 Mar 24 – Apr 28 Jul 25 – Aug 11 Mar 24, Apr 18–22
Waterbury, CT 估算 6a Mar 21 Apr 4 – May 9 Jul 14 – Jul 31 Apr 18–22
Dover, DE 估算 7b Feb 26 Mar 12 – Apr 16 Aug 3 – Aug 20 Mar 19–24
Wilmington, DE 估算 7a Mar 2 Mar 16 – Apr 20 Aug 1 – Aug 18 Mar 19–24
Downtown DC, DC 估算 7b Feb 24 Mar 10 – Apr 14 Aug 4 – Aug 21 Mar 19–24
Washington, DC 估算 7b Feb 24 Mar 10 – Apr 14 Aug 4 – Aug 21 Mar 19–24
Washington, D.C., DC 8a Feb 10 Feb 24 – Mar 31 Aug 20 – Sep 6 Mar 19–24
Gainesville, FL 估算 9a Jan 17 Jan 31 – Mar 7 Sep 7 – Sep 24 Feb 18–23
Tallahassee, FL 9a Jan 31 Feb 14 – Mar 21 Aug 25 – Sep 11 Feb 18–23
Athens, GA 估算 8a Feb 15 Mar 1 – Apr 5 Aug 9 – Aug 26 Mar 19–24
Atlanta, GA 8b Feb 1 Feb 15 – Mar 22 Aug 22 – Sep 8 Feb 18–23
Columbus, GA 估算 8b Feb 6 Feb 20 – Mar 27 Aug 15 – Sep 1 Feb 20–23, Mar 19–20
Johns Creek, GA 估算 8a Feb 18 Mar 4 – Apr 8 Aug 7 – Aug 24 Mar 19–24
Macon, GA 估算 8b Feb 6 Feb 20 – Mar 27 Aug 14 – Aug 31 Feb 20–23, Mar 19–20
Roswell, GA 估算 8a Feb 18 Mar 4 – Apr 8 Aug 7 – Aug 24 Mar 19–24
Sandy Springs, GA 估算 8a Feb 11 Feb 25 – Apr 1 Aug 12 – Aug 29 Mar 19–24
Savannah, GA 9a Jan 19 Feb 2 – Mar 9 Sep 1 – Sep 18 Feb 18–23
South Fulton, GA 估算 8a Feb 15 Mar 1 – Apr 5 Aug 8 – Aug 25 Mar 19–24
Boise, ID 7b Mar 13 Mar 27 – May 1 Jul 23 – Aug 9 Apr 18–22
Lewiston, ID 7b Feb 23 Mar 9 – Apr 13 Jul 28 – Aug 14 Mar 19–24
Meridian, ID 估算 7a Mar 26 Apr 9 – May 14 Jul 12 – Jul 29 Apr 18–22
Nampa, ID 估算 7a Mar 14 Mar 28 – May 2 Jul 16 – Aug 2 Apr 18–22
Pocatello, ID 6a Apr 11 Apr 25 – May 30 Jun 20 – Jul 7 May 17–22
Aurora, IL 估算 5b Mar 12 Mar 26 – Apr 30 Jul 22 – Aug 8 Apr 18–22
Champaign, IL 估算 6a Mar 9 Mar 23 – Apr 27 Jul 20 – Aug 6 Mar 23–24, Apr 18–21
Chicago, IL 6a Mar 5 Mar 19 – Apr 23 Jul 30 – Aug 16 Mar 19–24
Cicero, IL 估算 6a Mar 6 Mar 20 – Apr 24 Jul 28 – Aug 14 Mar 20–24, Apr 18
Elgin, IL 估算 5b Mar 16 Mar 30 – May 4 Jul 20 – Aug 6 Apr 18–22
Joliet, IL 估算 5b Mar 12 Mar 26 – Apr 30 Jul 22 – Aug 8 Apr 18–22
Naperville, IL 估算 5b Mar 12 Mar 26 – Apr 30 Jul 22 – Aug 8 Apr 18–22
Near North Side, IL 估算 6a Mar 6 Mar 20 – Apr 24 Jul 28 – Aug 14 Mar 20–24, Apr 18
North Peoria, IL 估算 5b Mar 9 Mar 23 – Apr 27 Jul 21 – Aug 7 Mar 23–24, Apr 18–21
Peoria, IL 估算 5b Mar 9 Mar 23 – Apr 27 Jul 21 – Aug 7 Mar 23–24, Apr 18–21
Rockford, IL 估算 5b Mar 16 Mar 30 – May 4 Jul 15 – Aug 1 Apr 18–22
Springfield, IL 估算 6a Mar 3 Mar 17 – Apr 21 Jul 23 – Aug 9 Mar 19–24
Waukegan, IL 估算 6a Mar 13 Mar 27 – May 1 Jul 25 – Aug 11 Apr 18–22
West Town, IL 估算 6a Mar 6 Mar 20 – Apr 24 Jul 28 – Aug 14 Mar 20–24, Apr 18
Bloomington, IN 估算 6a Mar 6 Mar 20 – Apr 24 Jul 24 – Aug 10 Mar 20–24, Apr 18
Carmel, IN 估算 6a Mar 6 Mar 20 – Apr 24 Jul 26 – Aug 12 Mar 20–24, Apr 18
Evansville, IN 7a Feb 21 Mar 7 – Apr 11 Jul 31 – Aug 17 Mar 19–24
Fort Wayne, IN 估算 6a Mar 17 Mar 31 – May 5 Jul 19 – Aug 5 Apr 18–22
Indianapolis, IN 6b Mar 1 Mar 15 – Apr 19 Jul 31 – Aug 17 Mar 19–24
South Bend, IN 估算 6a Mar 17 Mar 31 – May 5 Jul 22 – Aug 8 Apr 18–22
Cedar Rapids, IA 估算 5a Mar 20 Apr 3 – May 8 Jul 10 – Jul 27 Apr 18–22
Davenport, IA 估算 5b Mar 12 Mar 26 – Apr 30 Jul 18 – Aug 4 Apr 18–22
Des Moines, IA 5b Mar 7 Mar 21 – Apr 25 Jul 22 – Aug 8 Mar 21–24, Apr 18–19
Dodge City, KS 6b Mar 10 Mar 24 – Apr 28 Jul 22 – Aug 8 Mar 24, Apr 18–22
Goodland, KS 6a Mar 21 Apr 4 – May 9 Jul 13 – Jul 30 Apr 18–22
Kansas City, KS 估算 6b Mar 3 Mar 17 – Apr 21 Jul 26 – Aug 12 Mar 19–24
Lawrence, KS 估算 6b Mar 3 Mar 17 – Apr 21 Jul 26 – Aug 12 Mar 19–24
Olathe, KS 估算 6b Feb 28 Mar 14 – Apr 18 Jul 29 – Aug 15 Mar 19–24
Overland Park, KS 估算 6b Feb 28 Mar 14 – Apr 18 Jul 29 – Aug 15 Mar 19–24
Topeka, KS 估算 6b Mar 5 Mar 19 – Apr 23 Jul 23 – Aug 9 Mar 19–24
Wichita, KS 估算 7a Mar 1 Mar 15 – Apr 19 Jul 28 – Aug 14 Mar 19–24
Lexington, KY 7a Mar 2 Mar 16 – Apr 20 Jul 30 – Aug 16 Mar 19–24
Lexington-Fayette, KY 估算 6b Mar 5 Mar 19 – Apr 23 Jul 26 – Aug 12 Mar 19–24
Louisville, KY 估算 7a Feb 26 Mar 12 – Apr 16 Aug 1 – Aug 18 Mar 19–24
Meads, KY 估算 6b Mar 10 Mar 24 – Apr 28 Jul 24 – Aug 10 Mar 24, Apr 18–22
Baton Rouge, LA 9a Jan 14 Jan 28 – Mar 4 Aug 28 – Sep 14 Feb 18–23
Lafayette, LA 估算 9a Jan 10 Jan 24 – Feb 28 Sep 2 – Sep 19 Jan 24, Feb 18–22
Shreveport, LA 8b Jan 17 Jan 31 – Mar 7 Aug 26 – Sep 12 Feb 18–23
Bangor, ME 估算 5a Mar 26 Apr 9 – May 14 Jul 6 – Jul 23 Apr 18–22
Caribou, ME 4b Mar 26 Apr 9 – May 14 Jul 3 – Jul 20 Apr 18–22
Lewiston, ME 估算 5b Mar 23 Apr 6 – May 11 Jul 10 – Jul 27 Apr 18–22
Portland, ME 6a Mar 15 Mar 29 – May 3 Jul 17 – Aug 3 Apr 18–22
Baltimore, MD 估算 7b Feb 26 Mar 12 – Apr 16 Aug 5 – Aug 22 Mar 19–24
Columbia, MD 估算 7b Feb 26 Mar 12 – Apr 16 Aug 5 – Aug 22 Mar 19–24
Germantown, MD 估算 7b Feb 28 Mar 14 – Apr 18 Aug 1 – Aug 18 Mar 19–24
Boston, MA 7a Feb 21 Mar 7 – Apr 11 Aug 11 – Aug 28 Mar 19–24
Brockton, MA 估算 6b Mar 13 Mar 27 – May 1 Jul 19 – Aug 5 Apr 18–22
Cambridge, MA 估算 6b Mar 13 Mar 27 – May 1 Jul 19 – Aug 5 Apr 18–22
Dorchester, MA 估算 6b Mar 13 Mar 27 – May 1 Jul 19 – Aug 5 Apr 18–22
Fall River, MA 估算 7a Mar 7 Mar 21 – Apr 25 Jul 26 – Aug 12 Mar 21–24, Apr 18–19
Lowell, MA 估算 6a Mar 17 Mar 31 – May 5 Jul 15 – Aug 1 Apr 18–22
Lynn, MA 估算 7a Mar 8 Mar 22 – Apr 26 Jul 26 – Aug 12 Mar 22–24, Apr 18–20
New Bedford, MA 估算 7a Mar 10 Mar 24 – Apr 28 Jul 25 – Aug 11 Mar 24, Apr 18–22
Newton, MA 估算 6b Mar 13 Mar 27 – May 1 Jul 19 – Aug 5 Apr 18–22
Quincy, MA 估算 6b Mar 13 Mar 27 – May 1 Jul 19 – Aug 5 Apr 18–22
South Boston, MA 估算 6b Mar 13 Mar 27 – May 1 Jul 19 – Aug 5 Apr 18–22
Springfield, MA 估算 6a Mar 24 Apr 7 – May 12 Jul 11 – Jul 28 Apr 18–22
Worcester, MA 估算 6b Mar 18 Apr 1 – May 6 Jul 14 – Jul 31 Apr 18–22
Ann Arbor, MI 估算 6a Mar 21 Apr 4 – May 9 Jul 14 – Jul 31 Apr 18–22
Canton, MI 估算 6b Mar 15 Mar 29 – May 3 Jul 23 – Aug 9 Apr 18–22
Clinton Township, MI 估算 6a Mar 20 Apr 3 – May 8 Jul 22 – Aug 8 Apr 18–22
Dearborn, MI 估算 6b Mar 15 Mar 29 – May 3 Jul 23 – Aug 9 Apr 18–22
Detroit, MI 估算 6b Mar 15 Mar 29 – May 3 Jul 23 – Aug 9 Apr 18–22
Detroit City, MI 6b Mar 10 Mar 24 – Apr 28 Aug 2 – Aug 19 Mar 24, Apr 18–22
Flint, MI 估算 6a Mar 23 Apr 6 – May 11 Jul 14 – Jul 31 Apr 18–22
Grand Rapids, MI 估算 6a Mar 23 Apr 6 – May 11 Jul 16 – Aug 2 Apr 18–22
Lansing, MI 估算 6a Mar 20 Apr 3 – May 8 Jul 17 – Aug 3 Apr 18–22
Livonia, MI 估算 6b Mar 15 Mar 29 – May 3 Jul 23 – Aug 9 Apr 18–22
Marquette, MI 6a Mar 27 Apr 10 – May 15 Jul 23 – Aug 9 Apr 18–22
Sterling Heights, MI 估算 6a Mar 21 Apr 4 – May 9 Jul 18 – Aug 4 Apr 18–22
Troy, MI 估算 6a Mar 21 Apr 4 – May 9 Jul 18 – Aug 4 Apr 18–22
Warren, MI 估算 6b Mar 15 Mar 29 – May 3 Jul 23 – Aug 9 Apr 18–22
Bloomington, MN 估算 5a Mar 16 Mar 30 – May 4 Jul 14 – Jul 31 Apr 18–22
Duluth, MN 5a Apr 2 Apr 16 – May 21 Jul 14 – Jul 31 Apr 18–22, May 17
Minneapolis, MN 估算 5a Mar 16 Mar 30 – May 4 Jul 14 – Jul 31 Apr 18–22
Minneapolis-St. Paul, MN 5a Mar 12 Mar 26 – Apr 30 Jul 20 – Aug 6 Apr 18–22
Rochester, MN 估算 4b Mar 21 Apr 4 – May 9 Jul 9 – Jul 26 Apr 18–22
Saint Paul, MN 估算 5a Mar 16 Mar 30 – May 4 Jul 14 – Jul 31 Apr 18–22
Gulfport, MS 估算 9a Jan 7 Jan 21 – Feb 25 Sep 7 – Sep 24 Jan 21–24, Feb 18–19
Jackson, MS 8b Jan 31 Feb 14 – Mar 21 Aug 16 – Sep 2 Feb 18–23
West Gulfport, MS 估算 9a Jan 7 Jan 21 – Feb 25 Sep 7 – Sep 24 Jan 21–24, Feb 18–19
Columbia, MO 估算 6b Feb 26 Mar 12 – Apr 16 Jul 29 – Aug 15 Mar 19–24
East Independence, MO 估算 6a Mar 4 Mar 18 – Apr 22 Jul 24 – Aug 10 Mar 19–24
Independence, MO 估算 6a Mar 4 Mar 18 – Apr 22 Jul 24 – Aug 10 Mar 19–24
Kansas City, MO 6b Mar 2 Mar 16 – Apr 20 Jul 26 – Aug 12 Mar 19–24
Lee's Summit, MO 估算 6b Feb 28 Mar 14 – Apr 18 Jul 28 – Aug 14 Mar 19–24
O'Fallon, MO 估算 6b Feb 27 Mar 13 – Apr 17 Jul 28 – Aug 14 Mar 19–24
Springfield, MO 估算 6b Mar 2 Mar 16 – Apr 20 Jul 25 – Aug 11 Mar 19–24
St. Louis, MO 估算 7a Feb 22 Mar 8 – Apr 12 Aug 1 – Aug 18 Mar 19–24
Billings, MT 5b Mar 23 Apr 6 – May 11 Jul 9 – Jul 26 Apr 18–22
Bozeman, MT 5a Apr 11 Apr 25 – May 30 Jun 25 – Jul 12 May 17–22
Butte, MT 估算 4b Apr 24 May 8 – Jun 12 Jun 13 – Jun 30 May 17–22
Great Falls, MT 估算 4b Apr 5 Apr 19 – May 24 Jun 26 – Jul 13 Apr 19–22, May 17–18
Missoula, MT 5b Apr 4 Apr 18 – May 23 Jun 28 – Jul 15 Apr 18–22, May 17
Bellevue, NE 估算 5b Mar 9 Mar 23 – Apr 27 Jul 19 – Aug 5 Mar 23–24, Apr 18–21
Lincoln, NE 估算 6a Mar 12 Mar 26 – Apr 30 Jul 16 – Aug 2 Apr 18–22
North Platte, NE 5b Mar 30 Apr 13 – May 18 Jul 3 – Jul 20 Apr 18–22, May 17
Omaha, NE 5b Mar 7 Mar 21 – Apr 25 Jul 23 – Aug 9 Mar 21–24, Apr 18–19
Scottsbluff, NE 5a Mar 24 Apr 7 – May 12 Jul 6 – Jul 23 Apr 18–22
Elko, NV 5b Apr 17 May 1 – Jun 5 Jun 20 – Jul 7 May 17–22
Enterprise, NV 估算 9a Jan 11 Jan 25 – Mar 1 Aug 27 – Sep 13 Feb 18–23
Henderson, NV 估算 9b Dec 21 Jan 4 – Feb 8 Sep 10 – Sep 27 Jan 19–24
Las Vegas, NV 9b Dec 13 Dec 27 – Jan 31 Sep 11 – Sep 28 Jan 19–24
North Las Vegas, NV 估算 9a Jan 11 Jan 25 – Mar 1 Aug 27 – Sep 13 Feb 18–23
Paradise, NV 估算 9a Jan 11 Jan 25 – Mar 1 Aug 27 – Sep 13 Feb 18–23
Reno, NV 7b Mar 9 Mar 23 – Apr 27 Jul 25 – Aug 11 Mar 23–24, Apr 18–21
Sparks, NV 估算 7a Mar 24 Apr 7 – May 12 Jul 17 – Aug 3 Apr 18–22
Spring Valley, NV 估算 9a Jan 11 Jan 25 – Mar 1 Aug 27 – Sep 13 Feb 18–23
Sunrise Manor, NV 估算 9a Jan 11 Jan 25 – Mar 1 Aug 27 – Sep 13 Feb 18–23
Concord, NH 5b Mar 27 Apr 10 – May 15 Jul 5 – Jul 22 Apr 18–22
Manchester, NH 估算 6a Mar 17 Mar 31 – May 5 Jul 15 – Aug 1 Apr 18–22
Nashua, NH 估算 6a Mar 17 Mar 31 – May 5 Jul 15 – Aug 1 Apr 18–22
Atlantic City, NJ 7a Mar 7 Mar 21 – Apr 25 Jul 31 – Aug 17 Mar 21–24, Apr 18–19
Clifton, NJ 估算 7a Feb 28 Mar 14 – Apr 18 Aug 3 – Aug 20 Mar 19–24
Edison, NJ 估算 7a Feb 28 Mar 14 – Apr 18 Aug 3 – Aug 20 Mar 19–24
Elizabeth, NJ 估算 7a Feb 28 Mar 14 – Apr 18 Aug 3 – Aug 20 Mar 19–24
Jersey City, NJ 估算 7a Feb 28 Mar 14 – Apr 18 Aug 3 – Aug 20 Mar 19–24
Newark, NJ 估算 7a Feb 28 Mar 14 – Apr 18 Aug 3 – Aug 20 Mar 19–24
Paterson, NJ 估算 7a Feb 28 Mar 14 – Apr 18 Aug 3 – Aug 20 Mar 19–24
Toms River, NJ 估算 7b Mar 4 Mar 18 – Apr 22 Aug 1 – Aug 18 Mar 19–24
Trenton, NJ 估算 7a Mar 5 Mar 19 – Apr 23 Jul 29 – Aug 15 Mar 19–24
Albuquerque, NM 8a Feb 23 Mar 9 – Apr 13 Aug 5 – Aug 22 Mar 19–24
Enchanted Hills, NM 估算 7b Mar 9 Mar 23 – Apr 27 Jul 24 – Aug 10 Mar 23–24, Apr 18–21
Las Cruces, NM 估算 8b Feb 6 Feb 20 – Mar 27 Aug 14 – Aug 31 Feb 20–23, Mar 19–20
Rio Rancho, NM 估算 7b Mar 9 Mar 23 – Apr 27 Jul 24 – Aug 10 Mar 23–24, Apr 18–21
Roswell, NM 7b Mar 2 Mar 16 – Apr 20 Aug 1 – Aug 18 Mar 19–24
Santa Fe, NM 7a Mar 23 Apr 6 – May 11 Jul 17 – Aug 3 Apr 18–22
Albany, NY 6a Mar 16 Mar 30 – May 4 Jul 17 – Aug 3 Apr 18–22
Amherst, NY 估算 6a Mar 22 Apr 5 – May 10 Jul 19 – Aug 5 Apr 18–22
Borough Park, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
Buffalo, NY 估算 6a Mar 22 Apr 5 – May 10 Jul 19 – Aug 5 Apr 18–22
Bushwick, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
Canarsie, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
Chinatown, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
Corona, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
East Flatbush, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
East Harlem, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
East New York, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
Elmhurst, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
Flatbush, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
Fordham, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
Gravesend, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
Greenburgh, NY 估算 7a Mar 10 Mar 24 – Apr 28 Jul 25 – Aug 11 Mar 24, Apr 18–22
Jamaica, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
New York City, NY 估算 7a Feb 28 Mar 14 – Apr 18 Aug 3 – Aug 20 Mar 19–24
Richmond Hill, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
Rochester, NY 估算 6b Mar 16 Mar 30 – May 4 Jul 24 – Aug 10 Apr 18–22
Sheepshead Bay, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
Sunset Park, NY 估算 7a Feb 28 Mar 14 – Apr 18 Aug 3 – Aug 20 Mar 19–24
Syracuse, NY 6a Mar 18 Apr 1 – May 6 Jul 21 – Aug 7 Apr 18–22
Upper West Side, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
West Albany, NY 估算 6a Mar 19 Apr 2 – May 7 Jul 15 – Aug 1 Apr 18–22
Yonkers, NY 估算 7b Feb 19 Mar 5 – Apr 9 Aug 15 – Sep 1 Mar 19–24
Asheville, NC 7b Feb 26 Mar 12 – Apr 16 Jul 30 – Aug 16 Mar 19–24
Cary, NC 估算 8a Feb 18 Mar 4 – Apr 8 Aug 7 – Aug 24 Mar 19–24
Charlotte, NC 估算 8a Feb 16 Mar 2 – Apr 6 Aug 6 – Aug 23 Mar 19–24
Concord, NC 估算 8a Feb 16 Mar 2 – Apr 6 Aug 6 – Aug 23 Mar 19–24
Durham, NC 估算 8a Feb 18 Mar 4 – Apr 8 Aug 7 – Aug 24 Mar 19–24
Fayetteville, NC 估算 8a Feb 15 Mar 1 – Apr 5 Aug 9 – Aug 26 Mar 19–24
Greensboro, NC 估算 8a Feb 19 Mar 5 – Apr 9 Aug 6 – Aug 23 Mar 19–24
Greenville, NC 估算 8a Feb 12 Feb 26 – Apr 2 Aug 12 – Aug 29 Mar 19–24
High Point, NC 估算 8a Feb 22 Mar 8 – Apr 12 Aug 2 – Aug 19 Mar 19–24
Raleigh, NC 估算 8a Feb 18 Mar 4 – Apr 8 Aug 7 – Aug 24 Mar 19–24
Roanoke Rapids, NC 8a Feb 13 Feb 27 – Apr 3 Aug 14 – Aug 31 Mar 19–24
West Raleigh, NC 估算 8a Feb 18 Mar 4 – Apr 8 Aug 7 – Aug 24 Mar 19–24
Wilmington, NC 估算 8b Feb 10 Feb 24 – Mar 31 Aug 16 – Sep 2 Mar 19–24
Winston-Salem, NC 估算 7b Feb 26 Mar 12 – Apr 16 Aug 1 – Aug 18 Mar 19–24
Bismarck, ND 4b Mar 29 Apr 12 – May 17 Jul 2 – Jul 19 Apr 18–22, May 17
Fargo, ND 4a Mar 29 Apr 12 – May 17 Jul 2 – Jul 19 Apr 18–22, May 17
Grand Forks, ND 估算 4a Mar 30 Apr 13 – May 18 Jul 1 – Jul 18 Apr 18–22, May 17
Minot, ND 估算 4a Apr 1 Apr 15 – May 20 Jun 30 – Jul 17 Apr 18–22, May 17
Williston, ND 4a Apr 9 Apr 23 – May 28 Jun 23 – Jul 10 May 17–22
Akron, OH 估算 6b Mar 13 Mar 27 – May 1 Jul 28 – Aug 14 Apr 18–22
Cincinnati, OH 估算 6b Mar 9 Mar 23 – Apr 27 Jul 25 – Aug 11 Mar 23–24, Apr 18–21
Cleveland, OH 估算 6b Mar 13 Mar 27 – May 1 Jul 28 – Aug 14 Apr 18–22
Columbus, OH 估算 6b Mar 13 Mar 27 – May 1 Jul 22 – Aug 8 Apr 18–22
Dayton, OH 6a Mar 5 Mar 19 – Apr 23 Jul 30 – Aug 16 Mar 19–24
Toledo, OH 6b Mar 11 Mar 25 – Apr 29 Jul 26 – Aug 12 Apr 18–22
Broken Arrow, OK 估算 7b Feb 19 Mar 5 – Apr 9 Aug 4 – Aug 21 Mar 19–24
Cheyenne, OK 7b Feb 20 Mar 6 – Apr 10 Aug 5 – Aug 22 Mar 19–24
Edmond, OK 估算 7b Feb 21 Mar 7 – Apr 11 Aug 4 – Aug 21 Mar 19–24
Lawton, OK 估算 7b Feb 17 Mar 3 – Apr 7 Aug 6 – Aug 23 Mar 19–24
Norman, OK 估算 7b Feb 18 Mar 4 – Apr 8 Aug 6 – Aug 23 Mar 19–24
Oklahoma City, OK 7b Feb 19 Mar 5 – Apr 9 Aug 6 – Aug 23 Mar 19–24
Tulsa, OK 估算 7b Feb 19 Mar 5 – Apr 9 Aug 4 – Aug 21 Mar 19–24
Beaverton, OR 估算 8b Feb 6 Feb 20 – Mar 27 Aug 17 – Sep 3 Feb 20–23, Mar 19–20
Bend, OR 估算 6b Apr 20 May 4 – Jun 8 Jun 23 – Jul 10 May 17–22
Burns, OR 5b Apr 30 May 14 – Jun 18 — May 17–22
Eugene, OR 8b Feb 28 Mar 14 – Apr 18 Jul 25 – Aug 11 Mar 19–24
Gresham, OR 估算 8b Feb 24 Mar 10 – Apr 14 Aug 8 – Aug 25 Mar 19–24
Hillsboro, OR 估算 8b Feb 22 Mar 8 – Apr 12 Aug 6 – Aug 23 Mar 19–24
Medford, OR 8b Feb 25 Mar 11 – Apr 15 Jul 31 – Aug 17 Mar 19–24
Portland, OR 9a Jan 30 Feb 13 – Mar 20 Aug 21 – Sep 7 Feb 18–23
Salem, OR 估算 8b Mar 4 Mar 18 – Apr 22 Aug 3 – Aug 20 Mar 19–24
Allentown, PA 估算 6b Mar 14 Mar 28 – May 2 Jul 21 – Aug 7 Apr 18–22
Erie, PA 7a Mar 15 Mar 29 – May 3 Aug 6 – Aug 23 Apr 18–22
Philadelphia, PA 7b Feb 19 Mar 5 – Apr 9 Aug 12 – Aug 29 Mar 19–24
Pittsburgh, PA 7a Mar 7 Mar 21 – Apr 25 Jul 30 – Aug 16 Mar 21–24, Apr 18–19
Reading, PA 估算 7a Mar 7 Mar 21 – Apr 25 Jul 27 – Aug 13 Mar 21–24, Apr 18–19
Providence, RI 估算 7a Mar 7 Mar 21 – Apr 25 Jul 26 – Aug 12 Mar 21–24, Apr 18–19
Warwick, RI 估算 7a Mar 7 Mar 21 – Apr 25 Jul 26 – Aug 12 Mar 21–24, Apr 18–19
Charleston, SC 9a Jan 24 Feb 7 – Mar 14 Aug 29 – Sep 15 Feb 18–23
Columbia, SC 估算 8a Feb 15 Mar 1 – Apr 5 Aug 9 – Aug 26 Mar 19–24
North Charleston, SC 估算 9a Jan 18 Feb 1 – Mar 8 Sep 6 – Sep 23 Feb 18–23
Aberdeen, SD 估算 4a Mar 26 Apr 9 – May 14 Jul 2 – Jul 19 Apr 18–22
Brookings, SD 估算 4b Mar 24 Apr 7 – May 12 Jul 4 – Jul 21 Apr 18–22
Rapid City, SD 5a Mar 31 Apr 14 – May 19 Jul 3 – Jul 20 Apr 18–22, May 17
Sioux Falls, SD 5a Mar 15 Mar 29 – May 3 Jul 15 – Aug 1 Apr 18–22
Brownsville, TN 8a Feb 15 Mar 1 – Apr 5 Aug 7 – Aug 24 Mar 19–24
Chattanooga, TN 8a Feb 10 Feb 24 – Mar 31 Aug 11 – Aug 28 Mar 19–24
Clarksville, TN 估算 7a Feb 24 Mar 10 – Apr 14 Jul 31 – Aug 17 Mar 19–24
East Chattanooga, TN 估算 7b Feb 19 Mar 5 – Apr 9 Aug 4 – Aug 21 Mar 19–24
Franklin, TN 7b Feb 20 Mar 6 – Apr 10 Aug 2 – Aug 19 Mar 19–24
Knoxville, TN 7b Feb 18 Mar 4 – Apr 8 Aug 4 – Aug 21 Mar 19–24
Memphis, TN 8a Feb 2 Feb 16 – Mar 23 Aug 18 – Sep 4 Feb 18–23
Murfreesboro, TN 估算 7b Feb 28 Mar 14 – Apr 18 Jul 27 – Aug 13 Mar 19–24
Nashville, TN 7b Feb 17 Mar 3 – Apr 7 Aug 5 – Aug 22 Mar 19–24
New South Memphis, TN 估算 8a Feb 7 Feb 21 – Mar 28 Aug 11 – Aug 28 Feb 21–23, Mar 19–21
Smyrna, TN 7b Mar 2 Mar 16 – Apr 20 Jul 23 – Aug 9 Mar 19–24
Abilene, TX 估算 8a Feb 14 Feb 28 – Apr 4 Aug 9 – Aug 26 Mar 19–24
Alief, TX 估算 9b Jan 2 Jan 16 – Feb 20 Sep 11 – Sep 28 Jan 19–24
Allen, TX 估算 8b Feb 2 Feb 16 – Mar 23 Aug 18 – Sep 4 Feb 18–23
Amarillo, TX 7a Mar 4 Mar 18 – Apr 22 Jul 31 – Aug 17 Mar 19–24
Arlington, TX 估算 8b Jan 28 Feb 11 – Mar 18 Aug 21 – Sep 7 Feb 18–23
Austin, TX 9a Jan 29 Feb 12 – Mar 19 Aug 18 – Sep 4 Feb 18–23
Beaumont, TX 估算 9a Jan 13 Jan 27 – Mar 3 Aug 31 – Sep 17 Feb 18–23
Carrollton, TX 估算 8b Jan 27 Feb 10 – Mar 17 Aug 22 – Sep 8 Feb 18–23
College Station, TX 估算 9a Jan 22 Feb 5 – Mar 12 Aug 25 – Sep 11 Feb 18–23
Corpus Christi, TX 10a Dec 4 Dec 18 – Jan 22 Oct 1 – Oct 18 Dec 20–25
Cypress, TX 估算 9b Jan 2 Jan 16 – Feb 20 Sep 11 – Sep 28 Jan 19–24
Dallas, TX 估算 8b Jan 27 Feb 10 – Mar 17 Aug 22 – Sep 8 Feb 18–23
Denton, TX 估算 8a Feb 6 Feb 20 – Mar 27 Aug 15 – Sep 1 Feb 20–23, Mar 19–20
El Paso, TX 8b Jan 19 Feb 2 – Mar 9 Aug 22 – Sep 8 Feb 18–23
Fort Worth, TX 估算 8b Jan 28 Feb 11 – Mar 18 Aug 21 – Sep 7 Feb 18–23
Frisco, TX 估算 8b Feb 2 Feb 16 – Mar 23 Aug 18 – Sep 4 Feb 18–23
Garland, TX 估算 8b Jan 27 Feb 10 – Mar 17 Aug 22 – Sep 8 Feb 18–23
Grand Prairie, TX 估算 8b Jan 27 Feb 10 – Mar 17 Aug 22 – Sep 8 Feb 18–23
Houston, TX 9b Jan 2 Jan 16 – Feb 20 Sep 10 – Sep 27 Jan 19–24
Irving, TX 估算 8b Jan 27 Feb 10 – Mar 17 Aug 22 – Sep 8 Feb 18–23
Killeen, TX 估算 8b Jan 30 Feb 13 – Mar 20 Aug 19 – Sep 5 Feb 18–23
Laredo, TX 估算 9b Dec 24 Jan 7 – Feb 11 Sep 15 – Oct 2 Jan 19–24
League City, TX 估算 9b Dec 26 Jan 9 – Feb 13 Sep 18 – Oct 5 Jan 19–24
Lewisville, TX 估算 8b Feb 2 Feb 16 – Mar 23 Aug 18 – Sep 4 Feb 18–23
Lubbock, TX 7b Feb 10 Feb 24 – Mar 31 Aug 13 – Aug 30 Mar 19–24
McKinney, TX 估算 8b Feb 2 Feb 16 – Mar 23 Aug 18 – Sep 4 Feb 18–23
Mesquite, TX 估算 8b Jan 27 Feb 10 – Mar 17 Aug 22 – Sep 8 Feb 18–23
Midland, TX 8a Feb 12 Feb 26 – Apr 2 Aug 11 – Aug 28 Mar 19–24
Odessa, TX 估算 8a Feb 4 Feb 18 – Mar 25 Aug 15 – Sep 1 Feb 18–23
Paducah, TX 8a Feb 22 Mar 8 – Apr 12 Aug 5 – Aug 22 Mar 19–24
Pasadena, TX 估算 9b Dec 26 Jan 9 – Feb 13 Sep 18 – Oct 5 Jan 19–24
Pearland, TX 估算 9b Dec 26 Jan 9 – Feb 13 Sep 18 – Oct 5 Jan 19–24
Plano, TX 估算 8b Feb 2 Feb 16 – Mar 23 Aug 18 – Sep 4 Feb 18–23
Richardson, TX 估算 8b Jan 27 Feb 10 – Mar 17 Aug 22 – Sep 8 Feb 18–23
Round Rock, TX 估算 8b Jan 26 Feb 9 – Mar 16 Aug 23 – Sep 9 Feb 18–23
San Angelo, TX 估算 8a Feb 13 Feb 27 – Apr 3 Aug 9 – Aug 26 Mar 19–24
San Antonio, TX 9a Jan 15 Jan 29 – Mar 5 Aug 30 – Sep 16 Feb 18–23
Sugar Land, TX 估算 9b Jan 2 Jan 16 – Feb 20 Sep 11 – Sep 28 Jan 19–24
The Woodlands, TX 估算 9a Jan 14 Jan 28 – Mar 4 Sep 1 – Sep 18 Feb 18–23
Tyler, TX 估算 8b Jan 29 Feb 12 – Mar 19 Aug 20 – Sep 6 Feb 18–23
Waco, TX 估算 8b Feb 1 Feb 15 – Mar 22 Aug 17 – Sep 3 Feb 18–23
Wichita Falls, TX 8a Feb 12 Feb 26 – Apr 2 Aug 11 – Aug 28 Mar 19–24
Ogden, UT 估算 6a Apr 1 Apr 15 – May 20 Jul 6 – Jul 23 Apr 18–22, May 17
Orem, UT 估算 7a Mar 19 Apr 2 – May 7 Jul 16 – Aug 2 Apr 18–22
Provo, UT 估算 7a Mar 19 Apr 2 – May 7 Jul 16 – Aug 2 Apr 18–22
Salt Lake City, UT 7b Feb 25 Mar 11 – Apr 15 Aug 2 – Aug 19 Mar 19–24
Sandy, UT 估算 6b Mar 30 Apr 13 – May 18 Jul 10 – Jul 27 Apr 18–22, May 17
Sandy Hills, UT 估算 6b Mar 30 Apr 13 – May 18 Jul 10 – Jul 27 Apr 18–22, May 17
West Jordan, UT 估算 6b Mar 30 Apr 13 – May 18 Jul 10 – Jul 27 Apr 18–22, May 17
West Valley City, UT 估算 7a Mar 8 Mar 22 – Apr 26 Jul 26 – Aug 12 Mar 22–24, Apr 18–20
Burlington, VT 5a Mar 18 Apr 1 – May 6 Jul 17 – Aug 3 Apr 18–22
Colchester, VT 估算 5a Mar 24 Apr 7 – May 12 Jul 12 – Jul 29 Apr 18–22
South Burlington, VT 估算 5a Mar 25 Apr 8 – May 13 Jul 11 – Jul 28 Apr 18–22
Alexandria, VA 估算 7b Feb 24 Mar 10 – Apr 14 Aug 4 – Aug 21 Mar 19–24
Arlington, VA 估算 7b Feb 24 Mar 10 – Apr 14 Aug 4 – Aug 21 Mar 19–24
Chesapeake, VA 估算 8a Feb 12 Feb 26 – Apr 2 Aug 17 – Sep 3 Mar 19–24
East Hampton, VA 估算 8b Feb 10 Feb 24 – Mar 31 Aug 19 – Sep 5 Mar 19–24
Hampton, VA 估算 8b Feb 10 Feb 24 – Mar 31 Aug 19 – Sep 5 Mar 19–24
Newport News, VA 估算 8a Feb 12 Feb 26 – Apr 2 Aug 17 – Sep 3 Mar 19–24
Norfolk, VA 8b Feb 3 Feb 17 – Mar 24 Aug 25 – Sep 11 Feb 18–23
Portsmouth, VA 估算 8a Feb 12 Feb 26 – Apr 2 Aug 17 – Sep 3 Mar 19–24
Portsmouth Heights, VA 估算 8a Feb 12 Feb 26 – Apr 2 Aug 17 – Sep 3 Mar 19–24
Richmond, VA 7b Feb 20 Mar 6 – Apr 10 Aug 6 – Aug 23 Mar 19–24
Roanoke, VA 估算 7b Mar 1 Mar 15 – Apr 19 Jul 30 – Aug 16 Mar 19–24
Suffolk, VA 估算 8a Feb 23 Mar 9 – Apr 13 Aug 7 – Aug 24 Mar 19–24
Virginia Beach, VA 估算 8b Feb 4 Feb 18 – Mar 25 Aug 24 – Sep 10 Feb 18–23
Bellevue, WA 估算 9a Feb 6 Feb 20 – Mar 27 Aug 15 – Sep 1 Feb 20–23, Mar 19–20
Bellingham, WA 估算 8a Feb 22 Mar 8 – Apr 12 Aug 2 – Aug 19 Mar 19–24
Everett, WA 估算 9a Feb 6 Feb 20 – Mar 27 Aug 15 – Sep 1 Feb 20–23, Mar 19–20
Federal Way, WA 估算 8b Feb 14 Feb 28 – Apr 4 Aug 10 – Aug 27 Mar 19–24
Kent, WA 估算 8b Feb 14 Feb 28 – Apr 4 Aug 10 – Aug 27 Mar 19–24
Kirkland, WA 估算 9a Feb 6 Feb 20 – Mar 27 Aug 15 – Sep 1 Feb 20–23, Mar 19–20
Olympia, WA 8a Mar 18 Apr 1 – May 6 Jul 16 – Aug 2 Apr 18–22
Pasco, WA 7b Mar 16 Mar 30 – May 4 Jul 13 – Jul 30 Apr 18–22
Renton, WA 估算 8b Feb 14 Feb 28 – Apr 4 Aug 10 – Aug 27 Mar 19–24
Seattle, WA 9a Jan 19 Feb 2 – Mar 9 Aug 25 – Sep 11 Feb 18–23
Spokane, WA 6b Mar 15 Mar 29 – May 3 Jul 14 – Jul 31 Apr 18–22
Spokane Valley, WA 估算 6b Mar 26 Apr 9 – May 14 Jul 3 – Jul 20 Apr 18–22
Tacoma, WA 估算 8b Feb 14 Feb 28 – Apr 4 Aug 10 – Aug 27 Mar 19–24
Tri-Cities, WA 估算 7b Mar 3 Mar 17 – Apr 21 Jul 23 – Aug 9 Mar 19–24
Vancouver, WA 估算 8b Feb 22 Mar 8 – Apr 12 Aug 6 – Aug 23 Mar 19–24
Yakima, WA 7a Mar 27 Apr 10 – May 15 Jul 6 – Jul 23 Apr 18–22
Beckley, WV 6b Mar 11 Mar 25 – Apr 29 Jul 23 – Aug 9 Apr 18–22
Charleston, WV 7a Mar 5 Mar 19 – Apr 23 Jul 28 – Aug 14 Mar 19–24
Huntington, WV 估算 7a Mar 5 Mar 19 – Apr 23 Jul 29 – Aug 15 Mar 19–24
Parkersburg, WV 估算 6b Mar 13 Mar 27 – May 1 Jul 24 – Aug 10 Apr 18–22
Green Bay, WI 5b Mar 26 Apr 9 – May 14 Jul 11 – Jul 28 Apr 18–22
Kenosha, WI 估算 6a Mar 14 Mar 28 – May 2 Jul 23 – Aug 9 Apr 18–22
Madison, WI 估算 5a Mar 20 Apr 3 – May 8 Jul 12 – Jul 29 Apr 18–22
Milwaukee, WI 估算 6a Mar 16 Mar 30 – May 4 Jul 22 – Aug 8 Apr 18–22
Casper, WY 5a Apr 14 Apr 28 – Jun 2 Jun 24 – Jul 11 May 17–22
Cheyenne, WY 估算 5b Apr 5 Apr 19 – May 24 Jun 29 – Jul 16 Apr 19–22, May 17–18
Gillette, WY 估算 5a Apr 8 Apr 22 – May 27 Jun 28 – Jul 15 Apr 22, May 17–21
一句话总结:终霜日期是 50% 的概率——有一半的年份会在这之后还结霜。 Kohlrabi 属于 hardy,所以 轻微的晚霜还扛得住,但在又冷又湿的土里别硬来。

别错过 kohlrabi 的种植窗口

每逢新月和满月发一封短信,告诉你此刻哪些作物正好在种植窗口内。免费,一键退订。

We store your address to send the email and nothing else. No ads, never sold, unsubscribe any time. See our privacy policy.

这些数据到底有多准?

Extension recommendations for the same crop routinely disagree by two to four weeks, and occasionally more, so these offsets should be presented as windows and starting points rather than deadlines. Three things drive the spread. (1) Regional risk tolerance: for warm-season crops, Colorado State and Utah State put tomatoes, peppers and melons out about 14 days after the last frost, while University of Missouri's calendar works out to roughly 25-35 days after the last frost and University of Maryland's window runs from the frost date itself out to 45 days past it. That is a real 6-week spread for the single most popular garden crop, and it exists because a short-season mountain state is optimizing against a short season while a humid continental state is optimizing against cold, wet spring soil. (2) Soil temperature versus calendar date: most Extension services now say the honest trigger is soil temperature at 4 inches, not the frost date, and the frost-relative number is a convenience translation. A cold, wet spring can push the real date two or three weeks past the calendar recommendation. (3) Days-to-maturity is variety-specific and is measured differently for direct-seeded versus transplanted crops - seed catalogs count from transplant date for tomatoes, peppers, eggplant and cole crops, but from sowing for roots and greens - so a 'days to maturity' range of 60-85 for tomato is genuinely 60-85 depending on which packet you bought. Additionally, the average last frost is a 50% probability, meaning half of all years have a frost after that date; Extension services commonly advise waiting 1-2 weeks past it for anything frost-tender, or being prepared to cover. Treat every number here as plus or minus about 10-14 days.

其他作物

Tomato Pepper Eggplant Tomatillo Cucumber Zucchini / Summer Squash Winter Squash Pumpkin Watermelon Cantaloupe / Muskmelon Sweet Corn Green Beans (bush) Pole Beans Dry Beans Okra Sweet Potato Potato Onion (from sets/transplants) Garlic Leek Shallot Carrot Beet Radish Turnip Parsnip Lettuce (leaf) Lettuce (head) Spinach Kale Collards Swiss Chard Cabbage Broccoli Cauliflower Brussels Sprouts Peas (English/snap) Asparagus (crowns) Strawberry (crowns) Basil Cilantro Parsley Dill Chives Oregano Thyme Sage Rosemary

← 全部作物 · 改按地点浏览